Client: Amco Giffen

Project timescale: Manufacture and Installation during 2017

Kirkton Fish pass, River Almond

Solway Precast was awarded the manufacture of a sectional fish pass for the river Almond at Livingston. The units were a U-Channel with a sloping base to allow the client to fix a fish track to allow the fish to access above the weir.