Client: BAM Nuttall

Project timescale: 3 weeks in September 2021

OLE base Balloch Road Renton

Solway Precast was awarded to make an OLE base for the railway line improvement on Balloch Road at Renton in Dumbartonshire. The project had a short turnaround of 3 weeks, the base had to be cast upside down as all faces were mould finish and with projecting bolts on the top face and a weight of 17 tonnes added to the yard team difficulties on how to turn over.